Before you change anything, work out which kind of proxy edit you have. The fix for one is a single button. The fix for the other touches every clip and every sequence in the project.
Kind one: proxies attached inside Premiere
You imported the camera files and Premiere made proxies for them, either on ingest or with Create Proxies, or you used Attach Proxies later. The clips in your bin are still the originals. The proxies travel along with them, and your sequences were made at the original frame size.
In this case there is nothing to conform. Turn off the Toggle Proxies button in the Program Monitor (add it with the button editor if you do not see it) and the timeline plays the originals. By default, exports are made from the originals too.
Kind two: you edited with the proxy files themselves
This is common when proxies are made outside Premiere, on set or with another app, and then imported as ordinary clips. Your bin points at the proxy files, and your sequences were set to the proxy size, for example 1560 × 1040 for quarter size proxies of a 6240 × 4160 camera.
To finish this edit at full resolution, two things have to change together:
- Every clip has to point at its camera original instead of its proxy.
- Every sequence, nested ones included, has to grow to the original frame size.
Doing only the first makes every shot four times too big in its frame. Doing only the second makes every shot four times too small. Why that happens is covered in its own guide.
By hand
- Save a copy of the project and work in the copy, so your proxy cut stays untouched.
- Relink the clips. Select the proxy clips in the Project panel, choose Make Offline, then Link Media and point Premiere at the folder of originals. If your proxies carry a suffix such as
_Proxy, Premiere may ask you to find clips one at a time. - Resize every sequence. Open Sequence Settings for each sequence and set the frame size to the original size. Do the nested sequences as well, since each one is a sequence of its own.
- Fix what did not grow. Logos, stills and graphics keep their own pixel size, so their scale has to be multiplied by the same factor, for example 10% becomes 40% for quarter size proxies.
- Analyze Warp Stabilizer again on every stabilized clip. See Warp Stabilizer after relinking.
- Compare with the proxy cut. Export a few frames from both projects at the same times and check that the framing matches.
With Unproxy
Unproxy does steps 1 to 4 for you in your browser. Choose the project, the proxy folder and the folder of originals. It matches each proxy to its original, checks that their length, frame rate and start timecode agree, resizes every sequence, adjusts stills and logos, and gives you a new project file with the stabilized clips listed. Your original project is not changed.